Guide ยท Electric fire design

Planning a media wall around an electric fire

Choose the exact electric fire before the media wall is built. Its enclosure dimensions, ventilation, heat outlet, electrical supply, clearances and service access shape the structure. The television and other equipment then need their own safe positions and cable routes.

Updated 22 August 2026

Do not design around a generic fire opening

Electric fires that look similar can have different installation requirements. Use the current instructions for the chosen model to set the opening, support, recess depth, permitted materials, airflow and finishing detail.

Allow access to the components and connections the manufacturer says may need inspection or service. A wall that can only be repaired by destroying the finished surface is not a considered installation.

Plan heat and ventilation before the television position

Identify where the fire takes in air and where heated air leaves the appliance. Blocking or crowding those paths can affect performance and may conflict with the product requirements.

The television manufacturer instructions matter as well. A decorative shelf is not automatically a tested heat shield, and a visual gap cannot prove that electronics will remain within their permitted operating conditions.

Give the electrical design its own drawing

Confirm the supply, isolation and connection arrangement with a competent electrical installer. Include the television, sound equipment, lighting, network cables and any control equipment rather than adding extension leads inside a closed cavity later.

Cable routes should avoid heat and remain accessible where needed. If devices rely on wireless signals or infrared controls, test that the proposed recess and doors do not prevent normal operation.

Finish with proportions, not a template

Set the viewing height from the seating position and the room, not from an online fashion photograph. The fire width, screen width, side returns and storage can then be balanced around comfortable use.

Ask the Lichfield showroom which electric-fire options are currently available to consider as part of a room design. Product availability and the final building and electrical scope should be confirmed before construction starts.

Common questions

Can the television sit directly above an electric fire?

Only if both product instructions and the completed design allow it. Check the fire heat outlet, required clearances, television operating limits and ventilation.

Should the media wall be built before the fire arrives?

Final construction should be based on the exact current model and instructions. Building from an assumed opening risks poor fit, blocked airflow or lost service access.

Does every electric fire use a normal socket?

Do not assume so. Confirm the supply and isolation requirements for the exact model and have the electrical arrangement completed by a competent person.

Can a media wall include cupboards and sound equipment?

Yes where the layout preserves product airflow, heat limits, access and cable safety. Each device adds requirements that should be resolved before framing.

Turn the research into a property-specific plan

Bring your questions to the Lichfield showroom, or ask us to assess the room, chimney and proposed appliance at home before anything is ordered.

Ask about a home survey

More guides

Read next

What should you budget for a wood burner installation?

A clearer way to compare stove quotations without relying on a misleading headline figure.

Read the guide

Does your stove installation need a chimney liner?

Why lining is a survey decision rather than an automatic addition to every stove installation.

Read the guide

Can a wood burner be fitted without a masonry chimney?

What is involved in designing an insulated chimney system for a home with no suitable chimney.

Read the guide

Home-survey enquiry

Services & Coverage

  • Free Home Survey: Homeowners can call 07828 576002 with their postcode and project outline to check availability, discuss technical requirements, and arrange an initial site visit.
  • HETAS Certification: TFS solid-fuel installations are HETAS registered. Clients should verify the current business status, individual installer, and registered work categories on the official HETAS registry prior to booking.
  • Service Area: Published installation coverage includes Lichfield, Birmingham, Sutton Coldfield, Tamworth, Cannock, Walsall, Aldridge, Solihull, Wolverhampton, Burton upon Trent, Stafford, and Derby (all subject to postcode confirmation).

Still forming the brief? Ask the showroom what information to send →

If the form does not load, open it in a new tab or call 07828 576002.

We use your details to respond to your enquiry. Privacy policy.

Prefer to call the showroom?

Speak to the showroom

Check survey availability by phone

Share the property postcode and what you are considering. The showroom can confirm current coverage, whether the advertised free survey applies and what happens next.

Call 07828 576002Showroom details and opening hours →